Pace Systems 630-395-2260 Get a quote

Case studyElectricalField equipment

Illinois Tollway

Pace Systems installed and serviced about 90 power and data cabinets for the Illinois Tollway’s toll-collection system.

Get a quote

A Pace bucket truck and trailer in the lot under a blue sky.

The Challenge

The field equipment of the toll-collection system needed cabinets to power it and new UPS units, and protection from the heat and cold that could stop it, so Electronic Transaction Consultants, the toll-system integrator, took us on as its electrical and field-services subcontractor.

The system had to keep running around the clock, which meant emergency calls could come at any hour.

The Solution

We installed about 90 stainless power and data cabinets, rated NEMA 4X against water and corrosion, and replaced the system’s Eaton UPS units, which ran from 3 to 20 kVA.

Alongside the cabinets we put in about 150 heated stainless enclosures and about 200 cabinet air conditioners, and we upgraded about 80 nitrogen-generation units.

We fitted climate-control cabinets with self-diagnostics and a network card, so when a cabinet got too hot or too cold, it alerted dispatch and a technician could be sent out before the equipment failed.

  • UPS replacements
  • Climate-control cabinets
  • Cable repair
  • Accident repairs
  • Maintenance of traffic
  • Emergency cabinet replacement

The Result

The toll system kept running around the clock, and under our annual service agreements, emergency calls were answered at any hour, including replacing a cabinet when one was damaged.

  • About 90power and data cabinets
  • About 150heated enclosures
  • About 200cabinet air conditioners
  • About 80nitrogen-generation units

Next case study

Northbrook Leisure Center

AV for a major renovation

We put the audio-visual systems into the renovated building while it kept serving its programs and visitors.

Get a quote

Send Pace the specification for your field equipment.

We’ll quote the equipment and the installation directly, or work as the electrical and field-services subcontractor on an integrator’s job as we did here.

Keep in mind that a quote with installation takes longer than one for standard items.