Pace Systems 630-395-2260 Get a quote
Two Pace technicians, seen from behind, build new medical computer carts on their shipping pallets in Pace’s lab, one in a hoodie printed with the PACE logo.

Case studyDevicesIT staffing

Rush

Pace Systems imaged and asset-tagged nearly 4,000 HP mini PCs for Rush on one order.

Get a quote

The Challenge

Rush buys its computers from us by the thousand. Every one of them has to arrive with its software loaded, its asset tag on and its serial number on record, so that the hospital’s IT team can put it to work as soon as it’s unboxed.

The Solution

We imaged every one of the nearly 4,000 HP mini PCs on one order, put on its asset tag and recorded its serial number, which is the work our lab’s more than 100 stations are there for.

We also built more than 150 Ergotron StyleView carts with LiFe battery power, and every cart carries a computer and monitor, a waterproof keyboard and a Zebra healthcare scanner. We assembled and cabled every cart in our lab, so they reached the hospital ready to roll out instead of in boxes.

We’ve placed PC-support technicians on site at Rush, along with electrical and security-camera technicians when the work called for them, and their time is tracked by the hour.

  • HP mini PCs
  • Imaging and asset tags
  • Ergotron medical carts
  • Zebra healthcare scanners
  • Technicians on site
  • A row of new small desktop computers on their boxes in Pace’s lab, each cabled to a monitor and keyboard and being set up with its software.
  • A finished medical computer cart in Pace’s lab, monitor on, keyboard and mouse tray, a barcode scanner in its holder.

The Result

Tens of thousands of devices have gone to Rush, and they reach its IT team ready to put to work.

  • Nearly 4,000HP mini PCs imaged and tagged on one order
  • 150+medical carts built and cabled in our lab
  • 100+stations in the lab that set them up

Next case study

UChicago Medicine

Computer programs twice a year

Twice a year, UChicago Medicine buys a program of new computers from us on one blanket purchase order, and we image, asset-tag and install them.

Get a quote

Send Pace the list for your next refresh.

A spreadsheet or a part number is enough for us to quote from, and we usually quote standard items the same business day.

If the order needs imaging, asset tags or carts built, we’ll quote that work with it, so you can see the whole job in one quote.